JRC Response to the Discussion document – Strategic Review of Digital Communications

Download PDF Read time: 10 mins

Key points

  • JRC welcomes the opportunity to respond to this consultation.
  • JRC notes that Ofcom’s ‘key goal of our strategy is to make sure that the UK’s citizens and businesses are served by high-quality, widely available telecoms, both fixed and mobile.
  • JRC highlights that the stable supply of electricity is an essential resource for the delivery of almost all goods and / or services to UK citizens and consumers, e.g. high-quality, widely available telecoms, both fixed and mobile.
  • JRC highlights that the European Utilities Telecoms Council (EUTC) has identifiedthat an increasing amount of radio spectrum1 is / will be needed to manage the growing Utility Operations Smart Grid system(s)required for the long-term stable supply of electricity.
  • JRC hopes that Ofcom will recognise the importance of the UK-wide stable supply of electricity and facilitate the availability of spectrum for new and existing Utility Operations systems. It should be noted that Utility Operations communications typically need to be resilient, have priority access, and low end-to-end latency, etc,so standard public mobile systems may not be suitable as an alternative medium.
  • JRC notes ‘Ofcom’s overarching approach to improving availability has been to rely mainly on private sector investment, driven by competition’. Adding ‘This approach distinguishes communications from other network utilities such as water and energy where regulation plays a greater role in determining the specifics of investment programmes’.
  • JRC highlights that, regarding regulation,it may be necessary for the same regulatory / penalty obligations placed on Utility Operations systems to be added to any third-party communications system before the proposed system could be considered suitable. If not, then only self-owned and managed resilient-machine-to-machine (RM2M) systems are likely to continue to be suitable. (The energy utilities can expect a financial penalty if consumers are disconnected for more than 3 minutes.This penalty is multiplied by the number of disconnected customers. The duration is referred to as Customer Minutes Lost.)
  • JRC notes Ofcom’s statement that the private sector investment, driven by competition ‘approach will not deliver service availability for all consumers. In particular, poor service availability is a particular concern for consumers and businesses in more rural areas where the economics of commercial network deployment are more challenging. Private sector investment does therefore need to be supported by targeted intervention to extend network availability’. JRC highlights that meeting itsregulatory / penalty requirements has a cost that is met by the consumers. JRC therefore requests that the water and energy utilities should also be supported by targeted intervention / financial assistance to extend network availability.
  • JRC suggests that, regarding ‘What options are there for policy makers to do more to extend availability to areas that may otherwise not be commercially viable or take longer to cover’, Ofcom should compel public mobile operators to meet their license commitments on coverage in rural areas.
  • JRC highlights that, whilst digital modulation schemes can improve spectrum efficiency when the communications medium is operating at 100% capacity, the utilities typically use low data rate technologies in narrow band, e.g. 12.5 kHz, channels. It may therefore be considered incorrect when some suppliers repeatedly suggest that broadband is the only solution for data communication requirements.

1 http://eutc.org/sites/default/files/public/UTC_Public_files/EUTC%20Spectrum%20Position%20Paper.pdf 


Questions for discussion 

JRC agrees that promoting effective and sustainable competition remains an appropriate strategy to deliver efficient investment and widespread availability of services for the majority of consumers.

JRC notes ‘Ofcom’s overarching approach to improving availability has been to rely mainly on private sector investment, driven by competition’. Adding ‘This approach distinguishes communications from other network utilities such as water and energy where regulation plays a greater role in determining the specifics of investment programmes’.

JRC highlights that it may be necessary for the same regulatory / penalty obligations placed on Utility Operations systems to be added to any third-party communications system before the proposed system could be considered suitable. If not, then only self-owned and managed resilient-machine-to-machine (RM2M) systems are likely to continue to be suitable. (The energy utilities can expect severe financial penalty if consumers are disconnected for more than 3 minutes.)

JRC notes Ofcom’s statement that the private sector investment, driven by competition ‘approach will not deliver service availability for all consumers. In particular, poor service availability is a particular concern for consumers and businesses in more rural areas where the economics of commercial network deployment are more challenging. Private sector investment does therefore need to be supported by targeted intervention to extend network availability’. JRC highlights that meeting itsregulatory / penalty requirements has a cost that is met by the consumers. JRC therefore requests that the water and energy utilities should also be supported by targeted intervention / financial assistance to extend network availability.

JRC suggests that communications suppliers should be penalised for not supplying the service(s)for which they take payment. This could temper the claims whichare made by some suppliers, e.g. very high data rates.

JRC highlights that Utility Operations systems are typically designed for 99.0 to 99.99% availability. Public mobile systems would need to supply these availabilities, and other guarantees, even to potentially the remotest geographical locations in order for them to be considered for extensive Utility Operations communications.

JRC suggests that Ofcom should compel public mobile operators to meet their license commitments on coverage in rural areas.

JRC notes Ofcom’s statement that the private sector investment, driven by competition ‘approach will not deliver service availability for all consumers. In particular, poor service availability is a particular concern for consumers and businesses in more rural areas where the economics of commercial network deployment are more challenging. Private sector investment does therefore need to be supported by targeted intervention to extend network availability’.

JRC highlights that the utilities meeting their regulatory / penalty requirements has a cost that is met by the consumers. JRC therefore requests that the energy and water utilities should also be supported by targeted intervention / financial assistance to extend network availability.

JRC highlights that the utilities typically need to plan their grid control networks for 99.0 to 99.99% availability, even into remote rural areas.

JRC has no comments.

JRC has no comments.

JRC has no comments.

JRC has no comments.

JRC has no comments.

JRC has no comments.

JRC has no comments.

JRC has no comment.

JRC has no comments.

JRC has no comments.

JRC has no comment.

JRC has no comment.

JRC has no comments.

JRC has no comment.

JRC has no comment.

JRC has no comments.

JRC has no comments.

JRC has no comment.

JRC has no comment.

JRC has no comment.

JRC has no comments.

JRC has no comments.


Background

JRC Ltd is a wholly owned joint venture between the UK electricity and gas industries specifically created to manage the radio spectrum allocations for these industries used to support operational, safety and emergency communications. JRC also represents gas and electricity interests to government on radio issues.

JRC manages blocks of VHF and UHF spectrum for Private Business Radio applications, telemetry & tele-control services and network operations. JRC created and manages a national cellular plan for co-ordinating frequency assignments for a number of large radio networks in the UK.

JRC also manages a significant number of 1.4 GHz links and is keen for their protection and the on-going access to this band.

The VHF and UHF frequency allocations managed by JRC support telecommunications networks to keep the electricity and gas industries in touch with their network assets and field engineers throughout the country. The networks provide comprehensive geographical coverage to support the operation, installation, maintenance and repair of plant in all weather conditions on a 24 hour / 365 days per year basis.

JRC’s Scanning Telemetry Service is used by radio-based System Control and Data Acquisition (SCADA) networks, which control and monitor safety critical gas and electricity industry plant and equipment throughout the country. These networks provide resilient and reliable communications at all times to unmanned sites and plant in remote locations to maintain the integrity of the UK’s energy generation, transmission and distribution.

JRC works with the Energy Networks Association’s Future Energy Networks Groups assessing the ICT implications of Smart Networks, Smart Grids and Smart Meters.